Skip to content
+92 315 1103340 info@saonix.com | PEC & AEDB Certified · Pakistan's #1 Solar EPC

Solar Energy Solutions for Small Factories & SME Manufacturing Units

Cut Factory Electricity Costs by 40–80% With Industrial Solar

Small and medium manufacturing units – textile units, food processing, packaging, steel fabrication, printing – have heavy daytime electricity consumption that matches perfectly with solar generation hours. A properly designed factory solar system eliminates 40–80% of the electricity bill, removes load-shedding downtime on machinery, and qualifies for government and SBP green financing schemes.

Get Free Quote → WhatsApp Us

How It Works

  1. 1
    Factory Load Audit

    All machinery, motors, lighting, and HVAC surveyed to build an accurate load profile.

  2. 2
    Demand Analysis

    Peak demand in kVA and total monthly consumption in kWh calculated.

  3. 3
    Custom System Design

    Three-phase inverters selected. Panel array sized for available roof area and target bill offset.

  4. 4
    Grid-Tied or Hybrid Decision

    Grid-tied for maximum savings; hybrid with batteries for load-shedding backup. Decided based on your needs and budget.

  5. 5
    Industrial Installation

    Panels on factory roof or shed. Industrial-grade AC/DC panels, bus bars, MCBs, and surge protection installed to IEC standards.

  6. 6
    Net Metering

    DISCO application submitted and completed by Saonix.

  7. 7
    Commissioning and Training

    Factory staff trained on monitoring system. Monthly generation reports provided.

Key Benefits

  • 40–80% reduction in factory electricity bill from month one
  • Eliminates load-shedding downtime on production
  • Three-phase support for all industrial machinery
  • SBP Green Banking soft loan eligibility
  • Full ROI financial model provided before you commit

Frequently Asked Questions

Will solar work for three-phase industrial machinery?
Yes. Three-phase hybrid and grid-tied inverters fully support all industrial three-phase loads.
What if my factory runs at night?
A grid-tied system helps only during daytime. A hybrid battery system provides partial night backup. We calculate the optimum for your specific operating hours.
How much roof area does a 50 kW system need?
Approximately 300–350 sq ft per 10 kW. A 50 kW system needs roughly 1,500–1,750 sq ft of clear unshaded roof.
Can I get a subsidy or soft loan?
Yes. SBP Green Banking scheme and AEDB incentives are available. Saonix assists with all documentation.
What is the payback period for a factory system?
Typically 2.5–4 years depending on your tariff category and current bill. We provide a full financial model before any commitment.