Agricultural loads dominate Jhang β solar tube wells from 7.5HP to 50HP deliver payback in under 2 years against diesel pumping.
Solar services in Jhang
- Home solar systems (3β15kW hybrid)
- Commercial & industrial solar EPC
- Solar panel installation & structures
- Net metering (FESCO) processing
- Solar tube wells & agriculture solar
- Maintenance, cleaning & monitoring
Popular systems in Jhang
| System | Installed price* | Best for |
|---|---|---|
| 3kW | PKR 425kβ525k | Small homes |
| 5kW Hybrid | PKR 750kβ950k | 3-bed homes Β· backup |
| 15kW | PKR 2.1Mβ2.7M | Large homes Β· farms |
*Indicative all-inclusive 2026 ranges with Tier-1 equipment. See all sizes 3kWβ500kW, check today’s live price board, or size your system with the solar calculator.
Net metering with FESCO
Your net metering application in Jhang goes to FESCO. Saonix files it end to end β application, technical inspection, licence issuance, and bidirectional meter installation. Typical processing is 30β90 days; you provide CNIC, a recent bill, and property documents, and we handle the rest.
Why Saonix in Jhang
- National coverage from our Okara engineering base β travel included in your quotation upfront.
- Engineering-first: single-line diagram and string design shown before you pay.
- Tier-1 equipment only β Jinko, Longi, Huawei, GoodWe, PylonTech β with warranties registered in your name.
- 0% markup Saonix EMI on systems up to 20kW, and SBP bank financing support above that.
Jhang β quick answers
How fast can you install in Jhang?
Survey scheduled within a week; installation for a 5β10kW system takes 2β3 days on site. Net metering follows in 30β90 days via FESCO.
Is there a travel charge for Jhang?
A nominal travel and accommodation charge applies for Jhang and is stated upfront in your quotation β no surprises.